
Batten 40 × 60
Tropical hardwood
For floors and decking.
- Lengths
- 1500 · 1800 · 2250 mm
- Sold as
- Packs of 4
Installations
The air cavity between the base and the boards drains the water, reduces trapped moisture, allows the material to expand and extends the life of the system. It isn't a detail: it is the system.
Batten materials: tropical hardwood, bamboo, composite and aluminium
The automatic gap MibaFix leaves between tropical hardwood boards
Stainless steel grades for the clips, suitable for damp or salty environments
Foundations needed: the adjustable pedestals level out over the existing surface
Installation · Mibawood
We recommend tropical hardwood battens of the same density or higher: that is what guarantees a solid base and keeps the decking stable over time.

Tropical hardwood
For floors and decking.

Tropical hardwood
For cladding.

Aluminium
For floors or cladding.

Invisible fixing
For boards from 90 to 145 mm wide and 19 to 25 mm thick. An automatic 5 mm gap and an even spacing between boards.
Tropical hardwood · Fixing system
Invisible, modern, clip-in. For anyone after a deck with no visible screws, with a clean look and a secure fixing. A fast, aligned and professional installation, with the timber's natural movement under control.
Completely invisible fixing
Faster, more precise installation
Even gap between boards
Natural movement under control
Professional, long-lasting finish
Step 1
Building the substructure with the right joists and the correct spacing for the board thickness.
Step 2
Identifying, cutting and preparing the fixing pieces ready for the installation.
Step 3
Pre-drilling and the first placing of the fixings onto the joists, precisely.
Step 4
Marking and pre-drilling the first board to get the alignment right.
Step 5
Placing and screwing the first board onto the base structure.
Step 6
Pre-fitting the clips on every board to speed the installation up.
Step 7
Fitting the boards one after another, keeping the gap between them even.
Step 8
Adjusting the fixings at the far end before placing the last board.
Step 9
Placing and securing the last board with its fixings.
Step 10
Finishing the perimeter and the final fixing, for the stability and the look of the whole.
Tropical hardwood · Fixing system
Invisible, precise, durable. The CAMO Marksman® system fastens with screws driven at an angle through the edges of the board, with no visible holes on the surface. Suitable for tropical hardwood, composite and PVC.
Invisible fastening from the edges
Precise automatic spacing
Works with tropical hardwood and composite
Lifetime warranty against corrosion
Step 1
Set the CAMO to the width of the board to ensure precise fastening.
Step 2
Pre-drill with a Ø 4 mm bit on the sides to avoid splitting.
Step 3
Drive the screw at an angle, guided by the tool, for a hidden hold.
Step 4
Drive the CAMO screw all the way home for a firm, stable joint.
Tropical hardwood · Fixing system
Precision, strength, confidence. The most direct and structural solution for tropical hardwood decking: a firm fixing, full control during assembly and optimal strength in both residential and professional projects.
Direct structural fastening
Maximum mechanical strength
Full control during installation
Ideal for high-traffic projects
Step 1
Lay the first board on the substructure, aligned and level: it is the reference for the whole installation.
Step 2
Drill every fastening point before screwing to avoid splitting the wood.
Step 3
Screw in with a stainless steel screw at each drilled point, for a firm and lasting hold.
Step 1
A properly levelled slab is required, sloped for water run-off.
Step 2
The joists are laid in the direction of the water run-off.
Step 3
The joists are fixed keeping to the stated spacing.
Step 4
Fasten the decking boards correctly.
Step 1
Prepare the ground properly levelled and remove 15 to 20 cm of soil.
Step 2
Lay a geotextile fabric at the bottom of the slope to stop weeds growing through.
Step 3
Fill with stabilised material of different grain sizes and set concrete blocks to fix the joists on top, all level.
Step 4
Plan a slope so that water does not pool.
Installation · Mibacomp
The clips are high-strength stainless steel: they don't deform or rust, and they hold a constant gap between boards so the deck ventilates and drains.

Composite
A match for the decking itself.

Aluminium
Dimensional stability and corrosion resistance.

Invisible system
Everything you need, per square metre.

Finish
Hides holes and side grooves.
| Profile | Section | Length | Colours |
|---|---|---|---|
| Straight profile | 49 × 49 mm | 2200 mm | Brown, oak, grey and black |
| Angle profile | 49 × 49 mm | 2200 mm | Brown, oak, grey and black |
| Angle profile · Clásico and Rounding | 49.5 × 49.5 mm | 2200 mm | Brown, oak, grey and black |
| Trim | 11 × 71 mm | 2200 mm | Brown, oak, grey and black |
Composite WPC · Decking
The clips slot into the side groove of the board and screw to the joist: a firm, even hold with not one screw showing on the surface.
No screws on the surface
Allows lengthwise expansion
High outdoor resistance
A clean, professional finish
Step 1
Fixing the base structure, making sure it is level and correctly spaced.
Step 2
Fitting the starter clip at the end, to position the first board.
Step 3
Inserting the T-Clip into the side groove and screwing it to the joist.
Step 4
Clipping the board onto the T-Clips, keeping it aligned and evenly spaced.
Step 5
Repeating the process to keep the installation even.
Step 6
Fitting the side profile for a clean finish.
Composite WPC · Cladding
For outdoors and indoors. The screw stays hidden by the overlap between panels or behind the finishing profiles, so the result is a continuous, clean wall, hard-wearing and low-maintenance.
Safe structural fastening
Invisible screws
Low maintenance
High dimensional stability
A clean, professional finish
Step 1
A solid base on a level surface, with 500 mm spacing.
Step 2
Starter profile at the foot of the cladding, to align it and hide the fasteners.
Step 3
A profile at the corners for a clean meeting between panels, with the screw hidden.
Step 4
Continuous panels, screwed and overlapped, for an invisible and even installation.
Step 5
Keep the overlap between panels: stability and the screws completely out of sight.
Step 6
Finishing profiles for a neat, protected and lasting edge.
Installation · Mibambú
The boards sit raised on aluminium or bamboo battens, to help the water drain and the air circulate. That reduces trapped moisture and keeps the boards dimensionally stable.

Bamboo
Structural base for bamboo decking.

Aluminium
For floors or cladding.

A2 / A4 stainless steel
An even gap between boards, with mechanical and thermal resistance. Suitable for damp or salty environments.

Invisible system
Counted by the square metre.
| Profile | Section | Length |
|---|---|---|
| T profile | 50 × 15 mm | 1850 mm |
| L profile | 40 × 40 × 20 mm | 1850 mm |
| Double-T profile | 20 × 21 mm | 1850 mm |
Bamboo · Decking
The clip goes into the side groove of each board and screws to the joist, with not a single hole in sight. An even gap, ventilation between pieces and protection against damp and splitting.
Invisible fixing
An even gap
Better ventilation
Longer life outdoors
Step 1
A solid, level base. Fix the joists at the recommended spacing so they carry the loads in use.
Step 2
Fit the starter clip at the edge of the joist, clip in the first board and screw it down firmly.
Step 3
Fit the middle clips into the groove of the board already laid, slide in the next one and repeat.
Step 4
Fix the last board with end clips and apply end-grain sealer to the cuts, against damp.
Bamboo · Cladding
For ventilated façades, enclosures and sheltered external walls. The clip fixes the board to the joist without piercing the face, and the air cavity does the rest.
Invisible fixing
Natural movement under control
High dimensional stability
Longer life outdoors
A clean, modern look
Step 1
Check that the wall is level and mark out the installation guides.
Step 2
Joists aligned, 465 mm apart, and beams at 620 mm.
Step 3
Fix the clips on each joist, correctly aligned.
Step 4
Place and clip in the first panel, making sure it is level.
Step 5
Clip the boards in one after another, keeping the alignment.
Step 6
Cuts and trims, leaving the expansion joints.
Before you start
Metres of batten, support lines and clip quantities, as well as the boards.